Cuyahoga, OH: data center power outlook

Cuyahoga, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Cuyahoga carries 150 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Cuyahoga spans 3 utilities, with CITY OF CLEVELAND - (OH), CLEVELAND ELECTRIC ILLUM CO, OHIO EDISON CO among those mapped.

Grid position at a glance

Serving utilities
CITY OF CLEVELAND - (OH), CLEVELAND ELECTRIC ILLUM CO, OHIO EDISON CO
ISO / market
PJM (PJM Interconnection)
Highest grid access
345 kV
Substations in county
150
Industrial retail rate
8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 serving utilities: 1.8 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
356 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
89,062 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Cuyahoga

The material below frames Cuyahoga, Ohio for a prospective large load, drawing only on public sources. Grid access in Cuyahoga extends to 345 kV, a high-voltage line class. The mapped layer packs 150 substations into Cuyahoga, a dense spread of options.

Interconnection over Cuyahoga runs through the PJM market (PJM Interconnection) and its rules. For Cuyahoga, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Cuyahoga that report an industrial rate span 3 serving utilities: 1.8 to 9.3¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Cuyahoga, Ohio in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Cuyahoga, Ohio in EIA-860M as planned or under construction, which counts as a measured zero. Cuyahoga sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Cuyahoga withdrew 356.41 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 89,062 people are employed in construction within a 120 km commute of Cuyahoga (BLS QCEW), which frames staffing distance rather than free labour.

For Cuyahoga, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Cuyahoga, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Cuyahoga, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Cuyahoga, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.