Greene, OH: data center power outlook

Greene, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Greene carries 31 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Greene spans 4 utilities, with DAYTON POWER & LIGHT CO, OHIO EDISON CO, VILLAGE OF BLANCHESTER - (OH) among those mapped.

Grid position at a glance

Serving utilities
DAYTON POWER & LIGHT CO, OHIO EDISON CO, VILLAGE OF BLANCHESTER - (OH), VILLAGE OF YELLOW SPRINGS - (OH)
ISO / market
PJM (PJM Interconnection)
Highest grid access
345 kV
Substations in county
31
Industrial retail rate
8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 4 serving utilities: 1.8 to 1.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
175 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
17 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
127,791 employed in construction within ~120 km (38 of 41 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Greene

The material below frames Greene, Ohio for a prospective large load, drawing only on public sources. Grid access in Greene extends to 345 kV, a high-voltage line class. The mapped layer packs 31 substations into Greene, a dense spread of options.

Interconnection over Greene runs through the PJM market (PJM Interconnection) and its rules. For Greene, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Greene that report an industrial rate span 2 of 4 serving utilities: 1.8 to 1.9¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Greene, Ohio carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M records 175 MW planned or under construction for Greene. Greene sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Greene withdrew 16.82 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 127,791 people are employed in construction within a 120 km commute of Greene (BLS QCEW), which frames staffing distance rather than free labour.

For Greene, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Greene, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Greene, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Greene, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.