Power by county
Monroe, OH: data center power outlook
The grid around Monroe, Ohio is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Monroe the mapped layer shows 14 mapped substations, with grid access reaching 765 kV at its strongest point. Retail service across Monroe is split among 8 utilities, among them APPALACHIAN POWER CO, CITY OF NEW MARTINSVILLE - (WV), CITY OF WOODSFIELD - (OH).
Grid position at a glance
- Serving utilities
- APPALACHIAN POWER CO, CITY OF NEW MARTINSVILLE - (WV), CITY OF WOODSFIELD - (OH), MONONGAHELA POWER CO, OHIO POWER CO, SOUTH CENTRAL POWER COMPANY, WASHINGTON ELECTRIC COOP - (OH), WHEELING POWER CO
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 765 kV
- Substations in county
- 14
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 8 serving utilities: 2.6 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 4.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 31,718 employed in construction within ~120 km (39 of 41 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Monroe
The sections below set out what public data shows about siting a large electrical load in Monroe, Ohio. At 765 kV, Monroe carries extra-high-voltage transmission at its strongest mapped point. Monroe contains 14 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Monroe clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Monroe carries the state industrial average retail rate of 8.5 cents per kWh from EIA-861, applied statewide. For Monroe, the per-utility spread is 2 of 8 serving utilities: 2.6 to 10.8¢/kWh, which qualifies but never replaces the state average.
For Monroe, Ohio, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Monroe, Ohio, a real zero rather than a gap. In eGRID, the balancing authority over Monroe shows 716.09 lb CO2 per MWh.
For Monroe, the USGS 2015 compilation records 4.44 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Monroe sits within commuting range of roughly 31,718 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Monroe here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Monroe, Ohio settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Monroe, Ohio requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Monroe, Ohio are logged directly below, so each figure on this page can be traced back to its public dataset.