Morgan, OH: data center power outlook
The grid around Morgan, Ohio is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Morgan the mapped layer shows 11 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Morgan is split among 3 utilities, among them GUERNSEY-MUSKINGUM EL COOP INC, OHIO POWER CO, WASHINGTON ELECTRIC COOP - (OH).
Grid position at a glance
- Serving utilities
- GUERNSEY-MUSKINGUM EL COOP INC, OHIO POWER CO, WASHINGTON ELECTRIC COOP - (OH)
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 345 kV
- Substations in county
- 11
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 3 serving utilities: 2.6 to 14.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 15 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 67,098 employed in construction within ~120 km (36 of 38 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Morgan
Read on for the public power picture of Morgan in Ohio, assembled for data center siting. At 345 kV, Morgan carries high-voltage transmission at its strongest mapped point. Morgan contains 11 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Morgan clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Morgan carries the state industrial average retail rate of 8.5 cents per kWh from EIA-861, applied statewide. For Morgan, the per-utility spread is 2 of 3 serving utilities: 2.6 to 14.2¢/kWh, which qualifies but never replaces the state average.
For Morgan, Ohio, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Morgan, Ohio in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Morgan shows 716.09 lb CO2 per MWh.
For Morgan, the USGS 2015 compilation records 14.96 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Morgan sits within commuting range of roughly 67,098 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Morgan here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Morgan, Ohio settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Morgan, Ohio requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Morgan, Ohio are logged directly below, so each figure on this page can be traced back to its public dataset.