Power by county
Ottawa, OH: data center power outlook
Ottawa, Ohio is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Ottawa carries 15 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Ottawa spans 6 utilities, with HANCOCK-WOOD ELECTRIC COOP INC, OHIO EDISON CO, THE TOLEDO EDISON CO among those mapped.
Grid position at a glance
- Serving utilities
- HANCOCK-WOOD ELECTRIC COOP INC, OHIO EDISON CO, THE TOLEDO EDISON CO, VILLAGE OF ELMORE - (OH), VILLAGE OF GENOA - (OH), VILLAGE OF OAK HARBOR - (OH)
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 345 kV
- Substations in county
- 15
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 6 serving utilities: 1.8 to 11.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 52 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 74,319 employed in construction within ~120 km (26 of 27 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Ottawa
The material below frames Ottawa, Ohio for a prospective large load, drawing only on public sources. Grid access in Ottawa extends to 345 kV, a high-voltage line class. The mapped layer places 15 substations across Ottawa, a moderate density.
Interconnection over Ottawa runs through the PJM market (PJM Interconnection) and its rules. For Ottawa, the rate shown is the state industrial average of 8.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Ottawa that report an industrial rate span 2 of 6 serving utilities: 1.8 to 11.0¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Ottawa, Ohio in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M lists nothing planned or under construction for Ottawa, Ohio, which is a national filing and so a real zero. Ottawa sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Ottawa withdrew 52.11 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 74,319 people are employed in construction within a 120 km commute of Ottawa (BLS QCEW), which frames staffing distance rather than free labour.
For Ottawa, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Ottawa, Ohio describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Ottawa, Ohio, a specific address needs its own interconnection study, which this page does not attempt. The figures for Ottawa, Ohio refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.