Power by county
Union, OH: data center power outlook
The grid around Union, Ohio is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Union the mapped layer shows 17 mapped substations, with grid access reaching 765 kV at its strongest point. Retail service across Union is split among 9 utilities, among them CITY OF COLUMBUS - (OH), CONSOLIDATED COOPERATIVE, DAYTON POWER & LIGHT CO.
Grid position at a glance
- Serving utilities
- CITY OF COLUMBUS - (OH), CONSOLIDATED COOPERATIVE, DAYTON POWER & LIGHT CO, LOGAN COUNTY COOP POWER & LIGHT, MID-OHIO ENERGY COOP, INC, OHIO EDISON CO, OHIO POWER CO, PIONEER RURAL ELEC COOP, INC - (OH), UNION RURAL ELECTRIC COOP, INC
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 765 kV
- Substations in county
- 17
- Industrial retail rate
- 8.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 7 of 9 serving utilities: 1.8 to 11.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 50 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 8.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 98,427 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Union
Read on for the public power picture of Union in Ohio, assembled for data center siting. At 765 kV, Union carries extra-high-voltage transmission at its strongest mapped point. Union contains 17 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Union clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Union carries the state industrial average retail rate of 8.5 cents per kWh from EIA-861, applied statewide. For Union, the per-utility spread is 7 of 9 serving utilities: 1.8 to 11.6¢/kWh, which qualifies but never replaces the state average.
Union, Ohio shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. In Union, 50 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Union shows 716.09 lb CO2 per MWh.
For Union, the USGS 2015 compilation records 8.7 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Union sits within commuting range of roughly 98,427 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Union here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Union, Ohio settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Union, Ohio requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Union, Ohio are logged directly below, so each figure on this page can be traced back to its public dataset.