Power by county

Washita, OK: data center power outlook

Washita, Oklahoma is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Washita carries 11 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Washita spans 4 utilities, with CITY OF NEW CORDELL - (OK), CKENERGY ELECTRIC COOPERATIVE, NORTHFORK ELECTRIC COOP, INC among those mapped.

Grid position at a glance

Serving utilities
CITY OF NEW CORDELL - (OK), CKENERGY ELECTRIC COOPERATIVE, NORTHFORK ELECTRIC COOP, INC, PUBLIC SERVICE CO OF OKLAHOMA
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
11
Industrial retail rate
6.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 4 serving utilities: 5.9 to 6.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
17 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
7,717 employed in construction within ~120 km (14 of 17 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Washita

The material below frames Washita, Oklahoma for a prospective large load, drawing only on public sources. Grid access in Washita extends to 345 kV, a high-voltage line class. The mapped layer places 11 substations across Washita, a moderate density.

Interconnection over Washita runs through the SPP market (Southwest Power Pool) and its rules. For Washita, the rate shown is the state industrial average of 6.2 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Washita that report an industrial rate span 2 of 4 serving utilities: 5.9 to 6.8¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Washita, Oklahoma carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Washita, Oklahoma has no EIA-860M generation on file, which reads as zero rather than as a gap. Washita sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Washita withdrew 17.11 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 7,717 people are employed in construction within a 120 km commute of Washita (BLS QCEW), which frames staffing distance rather than free labour.

For Washita, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Washita, Oklahoma describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Washita, Oklahoma, a specific address needs its own interconnection study, which this page does not attempt. The figures for Washita, Oklahoma refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources