Power by county

Crook, OR: data center power outlook

The grid around Crook, Oregon is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Crook the mapped layer shows 14 mapped substations, with grid access reaching 1,000 kV at its strongest point. Retail service across Crook is split among 5 utilities, among them BONNEVILLE POWER ADMINISTRATION, CENTRAL ELECTRIC COOP INC - (OR), HARNEY ELECTRIC COOP, INC.

Grid position at a glance

Serving utilities
BONNEVILLE POWER ADMINISTRATION, CENTRAL ELECTRIC COOP INC - (OR), HARNEY ELECTRIC COOP, INC, PACIFICORP, WASCO ELECTRIC COOP, INC
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
1000 kV
Substations in county
14
Industrial retail rate
8.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 5 serving utilities: 7.3 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
74 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
212 lb CO2/MWh
Water withdrawals
145 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
9,118 employed in construction within ~120 km (4 of 5 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Crook

The sections below set out what public data shows about siting a large electrical load in Crook, Oregon. At 1,000 kV, Crook carries extra-high-voltage transmission at its strongest mapped point. Crook contains 14 mapped substations, a moderate footprint spread across the service area.

Crook, Oregon lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Crook carries the state industrial average retail rate of 8.3 cents per kWh from EIA-861, applied statewide. For Crook, the per-utility spread is 2 of 5 serving utilities: 7.3 to 9.7¢/kWh, which qualifies but never replaces the state average.

Crook, Oregon has nothing in the interconnection queue across the feeds covered here, quiet or uningested. In Crook, 73.5 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Crook shows 212.458 lb CO2 per MWh.

For Crook, the USGS 2015 compilation records 145.06 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Crook sits within commuting range of roughly 9,118 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Crook here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Crook, Oregon settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Crook, Oregon requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Crook, Oregon are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources