Lake, OR: data center power outlook

For Lake, Oregon, the public grid picture begins with its place in an area outside an organized wholesale market and the infrastructure mapped inside the county. Grid access across Lake tops out at 1,000 kV, over a footprint of 21 mapped substations. In Lake, 7 utilities share the retail territory, among them BONNEVILLE POWER ADMINISTRATION, CENTRAL ELECTRIC COOP INC - (OR), HARNEY ELECTRIC COOP, INC.

Grid position at a glance

Serving utilities
BONNEVILLE POWER ADMINISTRATION, CENTRAL ELECTRIC COOP INC - (OR), HARNEY ELECTRIC COOP, INC, MIDSTATE ELECTRIC COOP, INC, PACIFICORP, SURPRISE VALLEY ELECTRIFICATION, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
1000 kV
Substations in county
21
Industrial retail rate
8.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 7 serving utilities: 7.3 to 11.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
400 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
212 lb CO2/MWh
Water withdrawals
338 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
1,408 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Lake

For Lake, Oregon, the following sections turn public grid records into a siting-oriented summary. The highest mapped voltage in Lake is 1,000 kV, an extra-high-voltage line. Lake carries 21 substations, a dense footprint across the county.

There is no organized wholesale market over Lake, Oregon; arrangements run through the serving utility instead. The state industrial average retail rate is 8.3 cents per kWh, drawn from EIA-861 and applied to Lake at the state level rather than as a county rate. The serving utilities in Lake that publish a rate range 4 of 7 serving utilities: 7.3 to 11.9¢/kWh, a spread kept separate from the state average.

For Lake, Oregon, no queued project appears in the feeds currently covered. Federal filings (EIA-860M) list 400 MW of generation as planned or under construction in Lake. Grid carbon intensity for Lake, via its balancing authority, is 212.458 lb CO2 per MWh in eGRID.

USGS 2015 puts freshwater withdrawals across Lake at 337.5 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Lake, about 1,408 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.

Read the Lake figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Lake, Oregon qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Lake, Oregon turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Lake, Oregon traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.