Power by county
Union, OR: data center power outlook
Union, Oregon is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Union carries 18 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Union spans 6 utilities, with BONNEVILLE POWER ADMINISTRATION, COLUMBIA POWER COOP ASSN INC, IDAHO POWER CO among those mapped.
Grid position at a glance
- Serving utilities
- BONNEVILLE POWER ADMINISTRATION, COLUMBIA POWER COOP ASSN INC, IDAHO POWER CO, OREGON TRAIL EL CONS COOP, INC, PACIFICORP, UMATILLA ELECTRIC COOP ASSN
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 18
- Industrial retail rate
- 8.3¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 6.0 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 212 lb CO2/MWh
- Water withdrawals
- 211 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 4,838 employed in construction within ~120 km (8 of 9 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Union
The material below frames Union, Oregon for a prospective large load, drawing only on public sources. At 230 kV, Union sits in the transmission class that a large load would look to. The mapped layer places 18 substations across Union, a moderate density.
Union, Oregon is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Union, the rate shown is the state industrial average of 8.3 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Union that report an industrial rate span 4 of 6 serving utilities: 6.0 to 9.7¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Union, Oregon, which may be quiet or simply uningested. Nothing is on file for Union, Oregon in EIA-860M as planned or under construction, which counts as a measured zero. Union sits under a balancing authority that eGRID puts at 212.458 lb CO2 per MWh.
Union withdrew 211.2 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 4,838 people are employed in construction within a 120 km commute of Union (BLS QCEW), which frames staffing distance rather than free labour.
For Union, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Union, Oregon describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Union, Oregon, a specific address needs its own interconnection study, which this page does not attempt. The figures for Union, Oregon refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.