Power by county

Indiana, PA: data center power outlook

The grid around Indiana, Pennsylvania is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Indiana the mapped layer shows 20 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Indiana is split among 4 utilities, among them PENNSYLVANIA ELECTRIC CO, REA ENERGY COOP INC, UNITED ELECTRIC COOP, INC - (PA).

Grid position at a glance

Serving utilities
PENNSYLVANIA ELECTRIC CO, REA ENERGY COOP INC, UNITED ELECTRIC COOP, INC - (PA), WEST PENN POWER COMPANY
ISO / market
PJM (PJM Interconnection)
Highest grid access
500 kV
Substations in county
20
Industrial retail rate
9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 4 serving utilities: 11.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
4,396 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
43 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
73,156 employed in construction within ~120 km (22 of 23 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Indiana

Read on for the public power picture of Indiana in Pennsylvania, assembled for data center siting. At 500 kV, Indiana carries high-voltage transmission at its strongest mapped point. Indiana contains 20 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Indiana clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Indiana carries the state industrial average retail rate of 9.4 cents per kWh from EIA-861, applied statewide. For Indiana, the per-utility spread is 1 of 4 serving utilities: 11.3¢/kWh, which qualifies but never replaces the state average.

For Indiana, Pennsylvania, no queued project appears in the feeds currently covered. In Indiana, 4,396 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Indiana shows 716.09 lb CO2 per MWh.

For Indiana, the USGS 2015 compilation records 42.69 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Indiana sits within commuting range of roughly 73,156 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Indiana here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Indiana, Pennsylvania settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Indiana, Pennsylvania requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Indiana, Pennsylvania are logged directly below, so each figure on this page can be traced back to its public dataset.