Montgomery, Pennsylvania is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Montgomery carries 68 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Montgomery spans 5 utilities, with BOROUGH OF HATFIELD- (PA), BOROUGH OF LANSDALE, METROPOLITAN EDISON CO among those mapped.
Grid position at a glance
- Serving utilities
- BOROUGH OF HATFIELD- (PA), BOROUGH OF LANSDALE, METROPOLITAN EDISON CO, PECO ENERGY CO, PPL ELECTRIC UTILITIES CORP
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 500 kV
- Substations in county
- 68
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 5 serving utilities: 1.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 3 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 121 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 293,348 employed in construction within ~120 km (34 of 35 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Montgomery
What follows is a screening-grade read of Montgomery, Pennsylvania, built only from named public datasets. Grid access in Montgomery extends to 500 kV, a high-voltage line class. The mapped layer packs 68 substations into Montgomery, a dense spread of options.
Interconnection over Montgomery runs through the PJM market (PJM Interconnection) and its rules. For Montgomery, the rate shown is the state industrial average of 9.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Montgomery that report an industrial rate span 1 of 5 serving utilities: 1.7¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Montgomery, Pennsylvania carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M records 2.5 MW planned or under construction for Montgomery. Montgomery sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Montgomery withdrew 120.93 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 293,348 people are employed in construction within a 120 km commute of Montgomery (BLS QCEW), which frames staffing distance rather than free labour.
For Montgomery, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Montgomery, Pennsylvania describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Montgomery, Pennsylvania, a specific address needs its own interconnection study, which this page does not attempt. The figures for Montgomery, Pennsylvania refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.