Power by county
Somerset, PA: data center power outlook
For Somerset, Pennsylvania, the public grid picture begins with its place in the PJM market (PJM Interconnection) and the infrastructure mapped inside the county. Grid access across Somerset tops out at 230 kV, over a footprint of 29 mapped substations. In Somerset, 8 utilities share the retail territory, among them BEDFORD RURAL ELEC COOP, INC, BOROUGH OF BERLIN - (PA), HOOVERSVILLE BORO ELEC LGT CO.
Grid position at a glance
- Serving utilities
- BEDFORD RURAL ELEC COOP, INC, BOROUGH OF BERLIN - (PA), HOOVERSVILLE BORO ELEC LGT CO, PENNSYLVANIA ELECTRIC CO, REA ENERGY COOP INC, SOMERSET RURAL ELEC COOP, INC, THE POTOMAC EDISON COMPANY, WEST PENN POWER COMPANY
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 230 kV
- Substations in county
- 29
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 8 serving utilities: 9.8 to 11.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 15 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 27 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 72,883 employed in construction within ~120 km (27 of 29 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Somerset
For Somerset, Pennsylvania, the following sections turn public grid records into a siting-oriented summary. The strongest mapped access in Somerset is 230 kV, squarely transmission class. Somerset carries 29 substations, a dense footprint across the county.
For Somerset, the PJM market (PJM Interconnection) is the operator that handles interconnection and capacity. The state industrial average retail rate is 9.4 cents per kWh, drawn from EIA-861 and applied to Somerset at the state level rather than as a county rate. The serving utilities in Somerset that publish a rate range 3 of 8 serving utilities: 9.8 to 11.3¢/kWh, a spread kept separate from the state average.
For Somerset, Pennsylvania, no queued project appears in the feeds currently covered. Federal filings (EIA-860M) list 15 MW of generation as planned or under construction in Somerset. Grid carbon intensity for Somerset, via its balancing authority, is 716.09 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Somerset at 27.35 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Somerset, about 72,883 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Somerset figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Somerset, Pennsylvania qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Somerset, Pennsylvania turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Somerset, Pennsylvania traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.