Power by county

Faulk, SD: data center power outlook

The grid around Faulk, South Dakota is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Faulk the mapped layer shows 6 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Faulk is split among 7 utilities, among them CAM WAL ELECTRIC COOP, INC, DAKOTA ENERGY COOP INC, FEM ELECTRIC ASSN, INC.

Grid position at a glance

Serving utilities
CAM WAL ELECTRIC COOP, INC, DAKOTA ENERGY COOP INC, FEM ELECTRIC ASSN, INC, MONTANA-DAKOTA UTILITIES CO, NORTHERN ELECTRIC COOP, INC, NORTHWESTERN ENERGY - (SD), WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
6
Industrial retail rate
8.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 of 7 serving utilities: 1.9 to 11.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
1.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
2,454 employed in construction within ~120 km (12 of 16 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Faulk

The sections below set out what public data shows about siting a large electrical load in Faulk, South Dakota. At 345 kV, Faulk carries high-voltage transmission at its strongest mapped point. Faulk contains 6 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Faulk clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Faulk carries the state industrial average retail rate of 8.7 cents per kWh from EIA-861, applied statewide. For Faulk, the per-utility spread is 5 of 7 serving utilities: 1.9 to 11.3¢/kWh, which qualifies but never replaces the state average.

For Faulk, South Dakota, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Faulk, South Dakota, a real zero rather than a gap. In eGRID, the balancing authority over Faulk shows 871.526 lb CO2 per MWh.

For Faulk, the USGS 2015 compilation records 1 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Faulk sits within commuting range of roughly 2,454 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Faulk here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Faulk, South Dakota settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Faulk, South Dakota requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Faulk, South Dakota are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources