Power by county
Grant, SD: data center power outlook
Grant, South Dakota is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Grant carries 18 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Grant spans 12 utilities, with CITY OF BIG STONE CITY - (SD), CITY OF ORTONVILLE - (MN), CODINGTON-CLARK ELEC COOP, INC among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF BIG STONE CITY - (SD), CITY OF ORTONVILLE - (MN), CODINGTON-CLARK ELEC COOP, INC, H-D ELECTRIC COOP INC, LAKE REGION ELECTRIC ASSN, INC - (SD), MINNESOTA VALLEY COOP L&P ASSN, NORTHWESTERN ENERGY - (SD), OTTER TAIL POWER CO, SIOUX VALLEY SW ELEC COOP, TRAVERSE ELECTRIC COOP, INC, WAPA-- WESTERN AREA POWER ADMINISTRATION, WHETSTONE VALLEY ELEC COOP INC
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 18
- Industrial retail rate
- 8.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 12 serving utilities: 1.9 to 8.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 9 projects, 1,925 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 10 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 6,206 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Grant
What follows is a screening-grade read of Grant, South Dakota, built only from named public datasets. Grid access in Grant extends to 345 kV, a high-voltage line class. The mapped layer places 18 substations across Grant, a moderate density.
Interconnection over Grant runs through the SPP market (Southwest Power Pool) and its rules. For Grant, the rate shown is the state industrial average of 8.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Grant that report an industrial rate span 3 of 12 serving utilities: 1.9 to 8.7¢/kWh, shown as context and never as the county rate.
The queue feeds show 9 projects for Grant, totalling 1,925 MW of requested capacity. Grant, South Dakota has no EIA-860M generation on file, which reads as zero rather than as a gap. Grant sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.
Grant withdrew 10.46 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 6,206 people are employed in construction within a 120 km commute of Grant (BLS QCEW), which frames staffing distance rather than free labour.
For Grant, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Grant, South Dakota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Grant, South Dakota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Grant, South Dakota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.