Power by county

Todd, SD: data center power outlook

Todd, South Dakota is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Todd carries 3 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Todd spans 4 utilities, with CHERRY-TODD ELECTRIC COOP, INC, LACREEK ELECTRIC ASSN, INC, ROSEBUD ELECTRIC COOP INC among those mapped.

Grid position at a glance

Serving utilities
CHERRY-TODD ELECTRIC COOP, INC, LACREEK ELECTRIC ASSN, INC, ROSEBUD ELECTRIC COOP INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
115 kV
Substations in county
3
Industrial retail rate
8.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 4 serving utilities: 1.9 to 10.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
14 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
565 employed in construction within ~120 km (7 of 9 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Todd

What follows is a screening-grade read of Todd, South Dakota, built only from named public datasets. At 115 kV, Todd sits in the transmission class that a large load would look to. The mapped footprint in Todd, South Dakota is sparse, 3 substations, so options cluster at those points.

Sitting outside any organized market, Todd, South Dakota handles interconnection through its utility rather than a central operator. For Todd, the rate shown is the state industrial average of 8.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Todd that report an industrial rate span 2 of 4 serving utilities: 1.9 to 10.3¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Todd, South Dakota, which may be quiet or simply uningested. Nothing is on file for Todd, South Dakota in EIA-860M as planned or under construction, which counts as a measured zero. Todd sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Todd withdrew 13.96 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 565 people are employed in construction within a 120 km commute of Todd (BLS QCEW), which frames staffing distance rather than free labour.

For Todd, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Todd, South Dakota describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Todd, South Dakota, a specific address needs its own interconnection study, which this page does not attempt. The figures for Todd, South Dakota refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources