Power by county
Franklin, TN: data center power outlook
The grid around Franklin, Tennessee is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Franklin the mapped layer shows 33 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Franklin is split among 7 utilities, among them CITY OF FAYETTEVILLE, CITY OF HUNTSVILLE - (AL), CITY OF WINCHESTER - (TN).
Grid position at a glance
- Serving utilities
- CITY OF FAYETTEVILLE, CITY OF HUNTSVILLE - (AL), CITY OF WINCHESTER - (TN), DUCK RIVER ELEC MEMBER CORP, NORTH ALABAMA ELECTRIC COOP, SEQUACHEE VALLEY ELECTRIC COOP, TULLAHOMA BOARD-PUBLIC UTILS
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 33
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 7 serving utilities: 6.5 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 5.6 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 62,502 employed in construction within ~120 km (34 of 35 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Franklin
The sections below set out what public data shows about siting a large electrical load in Franklin, Tennessee. At 500 kV, Franklin carries high-voltage transmission at its strongest mapped point. Franklin contains 33 mapped substations, a dense footprint that spreads interconnection options across many points.
No organized wholesale market covers Franklin, Tennessee, so capacity moves through the local utility and bilateral agreements. Franklin carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Franklin, the per-utility spread is 5 of 7 serving utilities: 6.5 to 9.7¢/kWh, which qualifies but never replaces the state average.
Franklin, Tennessee has nothing in the interconnection queue across the feeds covered here, quiet or uningested. No generation is filed as planned or under construction in Franklin, Tennessee in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Franklin shows 641.018 lb CO2 per MWh.
For Franklin, the USGS 2015 compilation records 5.56 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Franklin sits within commuting range of roughly 62,502 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Franklin here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Franklin, Tennessee settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Franklin, Tennessee requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Franklin, Tennessee are logged directly below, so each figure on this page can be traced back to its public dataset.