The grid around Lawrence, Tennessee is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Lawrence the mapped layer shows 10 mapped substations, with grid access reaching 161 kV at its strongest point. Retail service across Lawrence is split among 6 utilities, among them CITY OF FLORENCE - (AL), CITY OF LAWRENCEBURG, CITY OF PULASKI - (TN).
Grid position at a glance
- Serving utilities
- CITY OF FLORENCE - (AL), CITY OF LAWRENCEBURG, CITY OF PULASKI - (TN), DUCK RIVER ELEC MEMBER CORP, MERIWETHER LEWIS ELECTRIC COOP, TENNESSEE VALLEY ELECTRIC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 161 kV
- Substations in county
- 10
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 5.9 to 8.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 5.5 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 77,282 employed in construction within ~120 km (32 of 33 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Lawrence
Read on for the public power picture of Lawrence in Tennessee, assembled for data center siting. Transmission-class access reaches 161 kV in Lawrence at its strongest mapped point. Lawrence contains 10 mapped substations, a moderate footprint spread across the service area.
Lawrence, Tennessee lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Lawrence carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Lawrence, the per-utility spread is 5 of 6 serving utilities: 5.9 to 8.8¢/kWh, which qualifies but never replaces the state average.
For Lawrence, Tennessee, no queued project appears in the feeds currently covered. For Lawrence, Tennessee, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Lawrence shows 641.018 lb CO2 per MWh.
For Lawrence, the USGS 2015 compilation records 5.48 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Lawrence sits within commuting range of roughly 77,282 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Lawrence here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Lawrence, Tennessee settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Lawrence, Tennessee requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Lawrence, Tennessee are logged directly below, so each figure on this page can be traced back to its public dataset.