Power by county

Madison, TN: data center power outlook

Madison, Tennessee is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Madison carries 48 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Madison spans 5 utilities, with BOLIVAR ENERGY AUTHORITY, CITY OF JACKSON - (TN), CITY OF MILAN among those mapped.

Grid position at a glance

Serving utilities
BOLIVAR ENERGY AUTHORITY, CITY OF JACKSON - (TN), CITY OF MILAN, GIBSON ELECTRIC MEMBERS CORP, SOUTHWEST TENNESSEE E M C
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
48
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 serving utilities: 6.3 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
42 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
641 lb CO2/MWh
Water withdrawals
21 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
35,892 employed in construction within ~120 km (30 of 34 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Madison

What follows is a screening-grade read of Madison, Tennessee, built only from named public datasets. Grid access in Madison extends to 500 kV, a high-voltage line class. The mapped layer packs 48 substations into Madison, a dense spread of options.

Sitting outside any organized market, Madison, Tennessee handles interconnection through its utility rather than a central operator. For Madison, the rate shown is the state industrial average of 6.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Madison that report an industrial rate span 5 serving utilities: 6.3 to 9.3¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Madison, Tennessee in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M records 42 MW planned or under construction for Madison. Madison sits under a balancing authority that eGRID puts at 641.018 lb CO2 per MWh.

Madison withdrew 20.95 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 35,892 people are employed in construction within a 120 km commute of Madison (BLS QCEW), which frames staffing distance rather than free labour.

For Madison, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Madison, Tennessee describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Madison, Tennessee, a specific address needs its own interconnection study, which this page does not attempt. The figures for Madison, Tennessee refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.