Power by county
Roane, TN: data center power outlook
For Roane, Tennessee, the public grid picture begins with its place in an area outside an organized wholesale market and the infrastructure mapped inside the county. Grid access across Roane tops out at 500 kV, over a footprint of 41 mapped substations. In Roane, 8 utilities share the retail territory, among them CITY OF CLINTON - (TN), CITY OF HARRIMAN - (TN), CITY OF LENOIR - (TN).
Grid position at a glance
- Serving utilities
- CITY OF CLINTON - (TN), CITY OF HARRIMAN - (TN), CITY OF LENOIR - (TN), CITY OF OAK RIDGE, CITY OF ROCKWOOD - (TN), CITY OF SWEETWATER, LOUDON UTILITIES BOARD, VOLUNTEER ELECTRIC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 41
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 8 serving utilities: 5.1 to 9.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 1,831 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 353 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 44,403 employed in construction within ~120 km (34 of 43 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Roane
For Roane, Tennessee, the following sections turn public grid records into a siting-oriented summary. The highest mapped voltage in Roane is 500 kV, in the high-voltage transmission class. Roane carries 41 substations, a dense footprint across the county.
Roane, Tennessee lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. The state industrial average retail rate is 6.7 cents per kWh, drawn from EIA-861 and applied to Roane at the state level rather than as a county rate. The serving utilities in Roane that publish a rate range 8 serving utilities: 5.1 to 9.0¢/kWh, a spread kept separate from the state average.
Roane, Tennessee shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. Federal filings (EIA-860M) list 1,830.6 MW of generation as planned or under construction in Roane. Grid carbon intensity for Roane, via its balancing authority, is 641.018 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Roane at 353.26 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Roane, about 44,403 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Roane figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Roane, Tennessee qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Roane, Tennessee turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Roane, Tennessee traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.