Weakley, TN: data center power outlook
The grid around Weakley, Tennessee is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Weakley the mapped layer shows 24 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Weakley is split among 5 utilities, among them CARROLL COUNTY - (TN), CITY OF PARIS - (TN), GIBSON ELECTRIC MEMBERS CORP.
Grid position at a glance
- Serving utilities
- CARROLL COUNTY - (TN), CITY OF PARIS - (TN), GIBSON ELECTRIC MEMBERS CORP, WEAKLEY COUNTY MUN ELEC SYS, WEST KENTUCKY RURAL E C C
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 24
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 5.2 to 9.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 5.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 18,240 employed in construction within ~120 km (31 of 39 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Weakley
Read on for the public power picture of Weakley in Tennessee, assembled for data center siting. At 500 kV, Weakley carries high-voltage transmission at its strongest mapped point. Weakley contains 24 mapped substations, a dense footprint that spreads interconnection options across many points.
Weakley, Tennessee lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Weakley carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Weakley, the per-utility spread is 4 of 5 serving utilities: 5.2 to 9.4¢/kWh, which qualifies but never replaces the state average.
Weakley, Tennessee shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. No generation is filed as planned or under construction in Weakley, Tennessee in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Weakley shows 641.018 lb CO2 per MWh.
For Weakley, the USGS 2015 compilation records 5.89 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Weakley sits within commuting range of roughly 18,240 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Weakley here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Weakley, Tennessee settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Weakley, Tennessee requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Weakley, Tennessee are logged directly below, so each figure on this page can be traced back to its public dataset.