Bexar, TX: data center power outlook
The grid around Bexar, Texas is summarized here from public data, starting from the county's position in the ERCOT market (Electric Reliability Council of Texas). Inside Bexar the mapped layer shows 98 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Bexar is split among 11 utilities, among them AEP TEXAS CENTRAL COMPANY, BANDERA ELECTRIC COOP, INC, BLUEBONNET ELECTRIC COOP, INC.
Grid position at a glance
- Serving utilities
- AEP TEXAS CENTRAL COMPANY, BANDERA ELECTRIC COOP, INC, BLUEBONNET ELECTRIC COOP, INC, CENTRAL TEXAS ELEC COOP, INC, CITY OF BOERNE, CITY OF SAN ANTONIO - (TX), GUADALUPE VALLEY ELEC COOP INC, KARNES ELECTRIC COOP INC, MEDINA ELECTRIC COOP, INC, PEDERNALES ELECTRIC COOP, INC, SOUTH TEXAS ELECTRIC COOP, INC
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 345 kV
- Substations in county
- 98
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 8 of 11 serving utilities: 5.4 to 10.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 23 projects, 5,170 MW
- Proposed generation
- 750 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 1,008 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 81,291 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Bexar
The sections below set out what public data shows about siting a large electrical load in Bexar, Texas. At 345 kV, Bexar carries high-voltage transmission at its strongest mapped point. Bexar contains 98 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Bexar clears through the ERCOT market (Electric Reliability Council of Texas), whose footprint sets how interconnection requests and capacity are handled. Bexar carries the state industrial average retail rate of 6.5 cents per kWh from EIA-861, applied statewide. For Bexar, the per-utility spread is 8 of 11 serving utilities: 5.4 to 10.2¢/kWh, which qualifies but never replaces the state average.
Bexar carries 23 projects in the interconnection queue, totalling 5,169.58 MW of requested capacity. In Bexar, 750 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Bexar shows 734.003 lb CO2 per MWh.
For Bexar, the USGS 2015 compilation records 1,007.9 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Bexar sits within commuting range of roughly 81,291 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Bexar here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Bexar, Texas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Bexar, Texas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Bexar, Texas are logged directly below, so each figure on this page can be traced back to its public dataset.