Power by county
Burnet, TX: data center power outlook
Burnet, Texas is served through the ERCOT market (Electric Reliability Council of Texas), and the figures below describe the public grid around a prospective data center site there. Burnet carries 14 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Burnet spans 9 utilities, with BARTLETT ELECTRIC COOP, INC, BLUEBONNET ELECTRIC COOP, INC, CENTRAL TEXAS ELEC COOP, INC among those mapped.
Grid position at a glance
- Serving utilities
- BARTLETT ELECTRIC COOP, INC, BLUEBONNET ELECTRIC COOP, INC, CENTRAL TEXAS ELEC COOP, INC, CITY OF BARTLETT - (TX), CITY OF BURNET - (TX), HAMILTON COUNTY ELEC COOP ASSN, HEART OF TEXAS ELECTRIC COOP, ONCOR ELECTRIC DELIVERY COMPANY LLC, PEDERNALES ELECTRIC COOP, INC
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 345 kV
- Substations in county
- 14
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 9 serving utilities: 5.6 to 10.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 4 projects, 395 MW
- Proposed generation
- 289 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 7.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 108,034 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Burnet
What follows is a screening-grade read of Burnet, Texas, built only from named public datasets. Grid access in Burnet extends to 345 kV, a high-voltage line class. The mapped layer places 14 substations across Burnet, a moderate density.
Interconnection over Burnet runs through the ERCOT market (Electric Reliability Council of Texas) and its rules. For Burnet, the rate shown is the state industrial average of 6.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Burnet that report an industrial rate span 4 of 9 serving utilities: 5.6 to 10.2¢/kWh, shown as context and never as the county rate.
The queue feeds show 4 projects for Burnet, totalling 394.69 MW of requested capacity. EIA-860M records 289 MW planned or under construction for Burnet. Burnet sits under a balancing authority that eGRID puts at 734.003 lb CO2 per MWh.
Burnet withdrew 7.88 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 108,034 people are employed in construction within a 120 km commute of Burnet (BLS QCEW), which frames staffing distance rather than free labour.
For Burnet, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Burnet, Texas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Burnet, Texas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Burnet, Texas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.