Power by county
Dawson, TX: data center power outlook
The grid around Dawson, Texas is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Dawson the mapped layer shows 11 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Dawson is split among 7 utilities, among them BIG COUNTRY ELECTRIC COOP, INC, CITY OF BROWNFIELD - (TX), LEA COUNTY ELECTRIC COOP, INC.
Grid position at a glance
- Serving utilities
- BIG COUNTRY ELECTRIC COOP, INC, CITY OF BROWNFIELD - (TX), LEA COUNTY ELECTRIC COOP, INC, LYNTEGAR ELECTRIC COOP, INC, ONCOR ELECTRIC DELIVERY COMPANY LLC, SOUTH PLAINS ELECTRIC COOP INC, SOUTHWESTERN PUBLIC SERVICE CO
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 11
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 7 serving utilities: 4.9 to 11.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 6 projects, 1,257 MW
- Proposed generation
- 300 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 49 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 27,178 employed in construction within ~120 km (12 of 19 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Dawson
Read on for the public power picture of Dawson in Texas, assembled for data center siting. At 345 kV, Dawson carries high-voltage transmission at its strongest mapped point. Dawson contains 11 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Dawson clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Dawson carries the state industrial average retail rate of 6.5 cents per kWh from EIA-861, applied statewide. For Dawson, the per-utility spread is 5 of 7 serving utilities: 4.9 to 11.8¢/kWh, which qualifies but never replaces the state average.
Dawson carries 6 projects in the interconnection queue, totalling 1,256.77 MW of requested capacity. In Dawson, 300 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Dawson shows 734.003 lb CO2 per MWh.
For Dawson, the USGS 2015 compilation records 49.15 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Dawson sits within commuting range of roughly 27,178 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Dawson here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Dawson, Texas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Dawson, Texas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Dawson, Texas are logged directly below, so each figure on this page can be traced back to its public dataset.