Power by county
Franklin, TX: data center power outlook
The grid around Franklin, Texas is summarized here from public data, starting from the county's position in the ERCOT market (Electric Reliability Council of Texas). Inside Franklin the mapped layer shows 13 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Franklin is split among 8 utilities, among them BOWIE-CASS ELECTRIC COOP, INC, FARMERS ELECTRIC COOP, INC - (TX), LAMAR COUNTY ELEC COOP ASSN.
Grid position at a glance
- Serving utilities
- BOWIE-CASS ELECTRIC COOP, INC, FARMERS ELECTRIC COOP, INC - (TX), LAMAR COUNTY ELEC COOP ASSN, ONCOR ELECTRIC DELIVERY COMPANY LLC, SOUTHWESTERN ELECTRIC POWER CO, TEXAS-NEW MEXICO POWER CO, UPSHUR RURAL ELEC COOP CORP, WOOD COUNTY ELECTRIC COOP, INC
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 345 kV
- Substations in county
- 13
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 8 serving utilities: 6.2 to 9.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 6 projects, 2,374 MW
- Proposed generation
- 51 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 5.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 27,951 employed in construction within ~120 km (23 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Franklin
Read on for the public power picture of Franklin in Texas, assembled for data center siting. At 345 kV, Franklin carries high-voltage transmission at its strongest mapped point. Franklin contains 13 mapped substations, a moderate footprint spread across the service area.
Wholesale activity over Franklin clears through the ERCOT market (Electric Reliability Council of Texas), whose footprint sets how interconnection requests and capacity are handled. Franklin carries the state industrial average retail rate of 6.5 cents per kWh from EIA-861, applied statewide. For Franklin, the per-utility spread is 4 of 8 serving utilities: 6.2 to 9.4¢/kWh, which qualifies but never replaces the state average.
Franklin carries 6 projects in the interconnection queue, totalling 2,373.98 MW of requested capacity. In Franklin, 50.9 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Franklin shows 734.003 lb CO2 per MWh.
For Franklin, the USGS 2015 compilation records 5.33 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Franklin sits within commuting range of roughly 27,951 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Franklin here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Franklin, Texas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Franklin, Texas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Franklin, Texas are logged directly below, so each figure on this page can be traced back to its public dataset.