Power by county
Hemphill, TX: data center power outlook
Hemphill, Texas is served through the ERCOT market (Electric Reliability Council of Texas), and the figures below describe the public grid around a prospective data center site there. Hemphill carries 5 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Hemphill spans 6 utilities, with GREENBELT ELECTRIC COOP, INC, NORTH PLAINS ELECTRIC COOP INC, NORTHFORK ELECTRIC COOP, INC among those mapped.
Grid position at a glance
- Serving utilities
- GREENBELT ELECTRIC COOP, INC, NORTH PLAINS ELECTRIC COOP INC, NORTHFORK ELECTRIC COOP, INC, NORTHWESTERN ELECTRIC COOP INC - (OK), PUBLIC SERVICE CO OF OKLAHOMA, SOUTHWESTERN PUBLIC SERVICE CO
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 138 kV
- Substations in county
- 5
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 4.9 to 8.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 4.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 4,585 employed in construction within ~120 km (15 of 18 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Hemphill
What follows is a screening-grade read of Hemphill, Texas, built only from named public datasets. At 138 kV, Hemphill sits in the transmission class that a large load would look to. Only 5 substations is mapped in Hemphill, Texas, keeping interconnection points few.
Interconnection over Hemphill runs through the ERCOT market (Electric Reliability Council of Texas) and its rules. For Hemphill, the rate shown is the state industrial average of 6.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Hemphill that report an industrial rate span 3 of 6 serving utilities: 4.9 to 8.1¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Hemphill, Texas carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M lists nothing planned or under construction for Hemphill, Texas, which is a national filing and so a real zero. Hemphill sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.
Hemphill withdrew 4.76 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 4,585 people are employed in construction within a 120 km commute of Hemphill (BLS QCEW), which frames staffing distance rather than free labour.
For Hemphill, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Hemphill, Texas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Hemphill, Texas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Hemphill, Texas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.