Matagorda, Texas is served through the ERCOT market (Electric Reliability Council of Texas), and the figures below describe the public grid around a prospective data center site there. Matagorda carries 22 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Matagorda spans 7 utilities, with AEP TEXAS CENTRAL COMPANY, CENTERPOINT ENERGY, GUADALUPE VALLEY ELEC COOP INC among those mapped.
Grid position at a glance
- Serving utilities
- AEP TEXAS CENTRAL COMPANY, CENTERPOINT ENERGY, GUADALUPE VALLEY ELEC COOP INC, JACKSON ELECTRIC COOP, INC - (TX), TEXAS-NEW MEXICO POWER CO, VICTORIA ELECTRIC COOP, INC, WHARTON COUNTY ELEC COOP, INC
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 345 kV
- Substations in county
- 22
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 7 serving utilities: 5.4 to 8.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 27 projects, 6,355 MW
- Proposed generation
- 1,134 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 82 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 46,735 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Matagorda
The material below frames Matagorda, Texas for a prospective large load, drawing only on public sources. Grid access in Matagorda extends to 345 kV, a high-voltage line class. The mapped layer packs 22 substations into Matagorda, a dense spread of options.
Interconnection over Matagorda runs through the ERCOT market (Electric Reliability Council of Texas) and its rules. For Matagorda, the rate shown is the state industrial average of 6.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Matagorda that report an industrial rate span 4 of 7 serving utilities: 5.4 to 8.3¢/kWh, shown as context and never as the county rate.
The queue feeds show 27 projects for Matagorda, totalling 6,354.99 MW of requested capacity. EIA-860M records 1,134.3 MW planned or under construction for Matagorda. Matagorda sits under a balancing authority that eGRID puts at 734.003 lb CO2 per MWh.
Matagorda withdrew 82.48 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 46,735 people are employed in construction within a 120 km commute of Matagorda (BLS QCEW), which frames staffing distance rather than free labour.
For Matagorda, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Matagorda, Texas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Matagorda, Texas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Matagorda, Texas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.