Motley sits in the ERCOT market (Electric Reliability Council of Texas); what follows is the screening-grade grid picture for Motley, Texas, drawn from public datasets. Counting from the mapped infrastructure, Motley holds 1 mapped substation and reaches 345 kV. Motley is covered by 6 retail service territories, including AEP TEXAS NORTH COMPANY, LIGHTHOUSE ELECTRIC COOP, INC, SOUTH PLAINS ELECTRIC COOP INC.
Grid position at a glance
- Serving utilities
- AEP TEXAS NORTH COMPANY, LIGHTHOUSE ELECTRIC COOP, INC, SOUTH PLAINS ELECTRIC COOP INC, SOUTHWESTERN ELECTRIC POWER CO, SOUTHWESTERN PUBLIC SERVICE CO, SWISHER ELECTRIC COOP, INC
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 345 kV
- Substations in county
- 1
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 4.9 to 13.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 2 projects, 852 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 8.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 8,852 employed in construction within ~120 km (9 of 22 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Motley
Below, Motley in Texas is described from public data as a starting point for siting diligence. Motley reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. The mapped footprint in Motley, Texas is sparse, 1 substation, so options cluster at those points.
Motley falls inside the ERCOT market (Electric Reliability Council of Texas), which governs how its interconnection requests and capacity move. The rate for Motley is the 6.5 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Motley, reported per-utility industrial rates cover 4 of 6 serving utilities: 4.9 to 13.1¢/kWh, offered only as context beneath the state figure.
Motley has 2 interconnection-queue projects on record, totalling 852 MW of requested capacity. Nothing is on file for Motley, Texas in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Motley carries a grid carbon intensity of 734.003 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Motley are 8.25 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Motley, some 8,852 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Motley are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Motley, Texas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Motley, Texas is an address-level interconnection study; the county figures here only narrow where to look. For Motley, Texas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.