Reagan, TX: data center power outlook
Reagan, Texas is served through the ERCOT market (Electric Reliability Council of Texas), and the figures below describe the public grid around a prospective data center site there. Reagan carries 14 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Reagan spans 7 utilities, with AEP TEXAS NORTH COMPANY, COLEMAN COUNTY ELEC COOP, INC, CONCHO VALLEY ELEC COOP INC among those mapped.
Grid position at a glance
- Serving utilities
- AEP TEXAS NORTH COMPANY, COLEMAN COUNTY ELEC COOP, INC, CONCHO VALLEY ELEC COOP INC, ONCOR ELECTRIC DELIVERY COMPANY LLC, RIO GRANDE ELECTRIC COOP, INC, SOUTHWEST TEXAS ELEC COOP, INC, TEXAS-NEW MEXICO POWER CO
- ISO / market
- ERCOT (Electric Reliability Council of Texas)
- Highest grid access
- 138 kV
- Substations in county
- 14
- Industrial retail rate
- 6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 7 serving utilities: 5.5 to 10.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 618 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 734 lb CO2/MWh
- Water withdrawals
- 23 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 21,349 employed in construction within ~120 km (10 of 15 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Reagan
What follows is a screening-grade read of Reagan, Texas, built only from named public datasets. At 138 kV, Reagan sits in the transmission class that a large load would look to. The mapped layer places 14 substations across Reagan, a moderate density.
Interconnection over Reagan runs through the ERCOT market (Electric Reliability Council of Texas) and its rules. For Reagan, the rate shown is the state industrial average of 6.5 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Reagan that report an industrial rate span 3 of 7 serving utilities: 5.5 to 10.2¢/kWh, shown as context and never as the county rate.
The queue feeds show 3 projects for Reagan, totalling 618.05 MW of requested capacity. EIA-860M lists nothing planned or under construction for Reagan, Texas, which is a national filing and so a real zero. Reagan sits under a balancing authority that eGRID puts at 734.003 lb CO2 per MWh.
Reagan withdrew 22.5 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 21,349 people are employed in construction within a 120 km commute of Reagan (BLS QCEW), which frames staffing distance rather than free labour.
For Reagan, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Reagan, Texas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Reagan, Texas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Reagan, Texas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.