Power by county

Terrell, TX: data center power outlook

The grid around Terrell, Texas is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Terrell the mapped layer shows 1 mapped substation, with grid access reaching 230 kV at its strongest point. Retail service across Terrell is split among 5 utilities, among them AEP TEXAS CENTRAL COMPANY, AEP TEXAS NORTH COMPANY, RIO GRANDE ELECTRIC COOP, INC.

Grid position at a glance

Serving utilities
AEP TEXAS CENTRAL COMPANY, AEP TEXAS NORTH COMPANY, RIO GRANDE ELECTRIC COOP, INC, SOUTHWEST TEXAS ELEC COOP, INC, TEXAS-NEW MEXICO POWER CO
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
1
Industrial retail rate
6.5¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 5 serving utilities: 7.7 to 10.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
734 lb CO2/MWh
Water withdrawals
1.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
947 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Terrell

The sections below set out what public data shows about siting a large electrical load in Terrell, Texas. Transmission-class access reaches 230 kV in Terrell at its strongest mapped point. Terrell, Texas contains 1 mapped substation, a sparse footprint that concentrates interconnection options at a few points.

No organized wholesale market covers Terrell, Texas, so capacity moves through the local utility and bilateral agreements. Terrell carries the state industrial average retail rate of 6.5 cents per kWh from EIA-861, applied statewide. For Terrell, the per-utility spread is 2 of 5 serving utilities: 7.7 to 10.2¢/kWh, which qualifies but never replaces the state average.

For Terrell, Texas, no queued project appears in the feeds currently covered. For Terrell, Texas, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Terrell shows 734.003 lb CO2 per MWh.

For Terrell, the USGS 2015 compilation records 0.98 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Terrell sits within commuting range of roughly 947 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Terrell here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Terrell, Texas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Terrell, Texas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Terrell, Texas are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources