Addison, VT: data center power outlook
Addison, Vermont is served through the ISONE market (ISO New England), and the figures below describe the public grid around a prospective data center site there. Addison carries 16 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Addison spans 3 utilities, with GREEN MOUNTAIN POWER CORP, NIAGARA MOHAWK POWER CORP., VERMONT ELECTRIC COOPERATIVE, INC among those mapped.
Grid position at a glance
- Serving utilities
- GREEN MOUNTAIN POWER CORP, NIAGARA MOHAWK POWER CORP., VERMONT ELECTRIC COOPERATIVE, INC
- ISO / market
- ISONE (ISO New England)
- Highest grid access
- 345 kV
- Substations in county
- 16
- Industrial retail rate
- 12.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 3 serving utilities: 10.8 to 12.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 50 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 541 lb CO2/MWh
- Water withdrawals
- 7.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 24,454 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Addison
What follows is a screening-grade read of Addison, Vermont, built only from named public datasets. Grid access in Addison extends to 345 kV, a high-voltage line class. The mapped layer places 16 substations across Addison, a moderate density.
Interconnection over Addison runs through the ISONE market (ISO New England) and its rules. For Addison, the rate shown is the state industrial average of 12.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Addison that report an industrial rate span 2 of 3 serving utilities: 10.8 to 12.9¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Addison, Vermont carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M records 50 MW planned or under construction for Addison. Addison sits under a balancing authority that eGRID puts at 541.365 lb CO2 per MWh.
Addison withdrew 7.84 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 24,454 people are employed in construction within a 120 km commute of Addison (BLS QCEW), which frames staffing distance rather than free labour.
For Addison, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Addison, Vermont describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Addison, Vermont, a specific address needs its own interconnection study, which this page does not attempt. The figures for Addison, Vermont refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.