Caledonia, Vermont is served through the ISONE market (ISO New England), and the figures below describe the public grid around a prospective data center site there. Caledonia carries 21 mapped substations within its boundary, and the highest reachable grid access is 450 kV. Service in Caledonia spans 8 utilities, with GREEN MOUNTAIN POWER CORP, LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC among those mapped.
Grid position at a glance
- Serving utilities
- GREEN MOUNTAIN POWER CORP, LIBERTY UTILITIES (GRANITE STATE ELECTRI, NEW HAMPSHIRE ELEC COOP INC, PUBLIC SERVICE CO OF NH, TOWN OF HARDWICK, VERMONT ELECTRIC COOPERATIVE, INC, VILLAGE OF LYNDONVILLE - (VT), WASHINGTON ELECTRIC COOP - (VT)
- ISO / market
- ISONE (ISO New England)
- Highest grid access
- 450 kV
- Substations in county
- 21
- Industrial retail rate
- 12.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 8 serving utilities: 10.8 to 12.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 541 lb CO2/MWh
- Water withdrawals
- 5.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 19,654 employed in construction within ~120 km (15 of 16 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Caledonia
The material below frames Caledonia, Vermont for a prospective large load, drawing only on public sources. Grid access in Caledonia extends to 450 kV, a high-voltage line class. The mapped layer packs 21 substations into Caledonia, a dense spread of options.
Interconnection over Caledonia runs through the ISONE market (ISO New England) and its rules. For Caledonia, the rate shown is the state industrial average of 12.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Caledonia that report an industrial rate span 2 of 8 serving utilities: 10.8 to 12.9¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Caledonia, Vermont in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Caledonia, Vermont has no EIA-860M generation on file, which reads as zero rather than as a gap. Caledonia sits under a balancing authority that eGRID puts at 541.365 lb CO2 per MWh.
Caledonia withdrew 5.09 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 19,654 people are employed in construction within a 120 km commute of Caledonia (BLS QCEW), which frames staffing distance rather than free labour.
For Caledonia, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Caledonia, Vermont describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Caledonia, Vermont, a specific address needs its own interconnection study, which this page does not attempt. The figures for Caledonia, Vermont refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.