The grid around Accomack, Virginia is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Accomack the mapped layer shows 19 mapped substations, with grid access reaching 138 kV at its strongest point. Retail service across Accomack is split among 3 utilities, among them A & N ELECTRIC COOP, CHOPTANK ELECTRIC COOPERATIVE, INC, DELMARVA POWER.

Grid position at a glance

Serving utilities
A & N ELECTRIC COOP, CHOPTANK ELECTRIC COOPERATIVE, INC, DELMARVA POWER
ISO / market
PJM (PJM Interconnection)
Highest grid access
138 kV
Substations in county
19
Industrial retail rate
9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 3 serving utilities: 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
18 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
46,485 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Accomack

The sections below set out what public data shows about siting a large electrical load in Accomack, Virginia. Transmission-class access reaches 138 kV in Accomack at its strongest mapped point. Accomack contains 19 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Accomack clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Accomack carries the state industrial average retail rate of 9.4 cents per kWh from EIA-861, applied statewide. For Accomack, the per-utility spread is 1 of 3 serving utilities: 9.7¢/kWh, which qualifies but never replaces the state average.

Accomack, Virginia has nothing in the interconnection queue across the feeds covered here, quiet or uningested. The federal EIA-860M inventory files no planned or under-construction generation in Accomack, Virginia, a real zero rather than a gap. In eGRID, the balancing authority over Accomack shows 716.09 lb CO2 per MWh.

For Accomack, the USGS 2015 compilation records 17.64 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Accomack sits within commuting range of roughly 46,485 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Accomack here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Accomack, Virginia settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Accomack, Virginia requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Accomack, Virginia are logged directly below, so each figure on this page can be traced back to its public dataset.