Power by county

Highland, VA: data center power outlook

Highland, Virginia is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Highland carries 1 mapped substation within its boundary, and the highest reachable grid access is 500 kV. Service in Highland spans 3 utilities, with BARC ELECTRIC COOP INC, MONONGAHELA POWER CO, SHENANDOAH VALLEY ELEC COOP among those mapped.

Grid position at a glance

Serving utilities
BARC ELECTRIC COOP INC, MONONGAHELA POWER CO, SHENANDOAH VALLEY ELEC COOP
ISO / market
PJM (PJM Interconnection)
Highest grid access
500 kV
Substations in county
1
Industrial retail rate
9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 3 serving utilities: 9.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
7.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
19,858 employed in construction within ~120 km (31 of 38 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Highland

What follows is a screening-grade read of Highland, Virginia, built only from named public datasets. Grid access in Highland extends to 500 kV, a high-voltage line class. Only 1 substation is mapped in Highland, Virginia, keeping interconnection points few.

Interconnection over Highland runs through the PJM market (PJM Interconnection) and its rules. For Highland, the rate shown is the state industrial average of 9.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Highland that report an industrial rate span 1 of 3 serving utilities: 9.1¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Highland, Virginia in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Highland, Virginia has no EIA-860M generation on file, which reads as zero rather than as a gap. Highland sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Highland withdrew 6.96 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 19,858 people are employed in construction within a 120 km commute of Highland (BLS QCEW), which frames staffing distance rather than free labour.

For Highland, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Highland, Virginia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Highland, Virginia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Highland, Virginia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources