Power by county
Montgomery, VA: data center power outlook
Montgomery, Virginia is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Montgomery carries 25 mapped substations within its boundary, and the highest reachable grid access is 765 kV. Service in Montgomery spans 4 utilities, with APPALACHIAN POWER CO, CITY OF RADFORD - (VA), CRAIG-BOTETOURT ELECTRIC COOP among those mapped.
Grid position at a glance
- Serving utilities
- APPALACHIAN POWER CO, CITY OF RADFORD - (VA), CRAIG-BOTETOURT ELECTRIC COOP, VIRGINIA TECH ELECTRIC SERVICE
- ISO / market
- PJM (PJM Interconnection)
- Highest grid access
- 765 kV
- Substations in county
- 25
- Industrial retail rate
- 9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 4 serving utilities: 9.9 to 11.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 716 lb CO2/MWh
- Water withdrawals
- 28 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 37,788 employed in construction within ~120 km (36 of 47 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Montgomery
The material below frames Montgomery, Virginia for a prospective large load, drawing only on public sources. Grid access in Montgomery extends to 765 kV, the extra-high-voltage class. The mapped layer packs 25 substations into Montgomery, a dense spread of options.
Interconnection over Montgomery runs through the PJM market (PJM Interconnection) and its rules. For Montgomery, the rate shown is the state industrial average of 9.4 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Montgomery that report an industrial rate span 2 of 4 serving utilities: 9.9 to 11.6¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Montgomery, Virginia carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Montgomery, Virginia in EIA-860M as planned or under construction, which counts as a measured zero. Montgomery sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.
Montgomery withdrew 28.46 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 37,788 people are employed in construction within a 120 km commute of Montgomery (BLS QCEW), which frames staffing distance rather than free labour.
For Montgomery, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Montgomery, Virginia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Montgomery, Virginia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Montgomery, Virginia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.