Wythe, VA: data center power outlook

The grid around Wythe, Virginia is summarized here from public data, starting from the county's position in the PJM market (PJM Interconnection). Inside Wythe the mapped layer shows 7 mapped substations, with grid access reaching 765 kV at its strongest point. Retail electric service across Wythe comes from APPALACHIAN POWER CO.

Grid position at a glance

Serving utilities
APPALACHIAN POWER CO
ISO / market
PJM (PJM Interconnection)
Highest grid access
765 kV
Substations in county
7
Industrial retail rate
9.4¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 serving utility: 9.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
9.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
34,154 employed in construction within ~120 km (34 of 44 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Wythe

The sections below set out what public data shows about siting a large electrical load in Wythe, Virginia. At 765 kV, Wythe carries extra-high-voltage transmission at its strongest mapped point. Wythe contains 7 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Wythe clears through the PJM market (PJM Interconnection), whose footprint sets how interconnection requests and capacity are handled. Wythe carries the state industrial average retail rate of 9.4 cents per kWh from EIA-861, applied statewide. For Wythe, the per-utility spread is 1 serving utility: 9.9¢/kWh, which qualifies but never replaces the state average.

For Wythe, Virginia, no queued project appears in the feeds currently covered. For Wythe, Virginia, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Wythe shows 716.09 lb CO2 per MWh.

For Wythe, the USGS 2015 compilation records 9.74 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Wythe sits within commuting range of roughly 34,154 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Wythe here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Wythe, Virginia settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Wythe, Virginia requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Wythe, Virginia are logged directly below, so each figure on this page can be traced back to its public dataset.