Power by county
Whitman, WA: data center power outlook
Whitman, Washington is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Whitman carries 30 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Whitman spans 6 utilities, with AVISTA CORP, BIG BEND ELECTRIC COOP, INC, BONNEVILLE POWER ADMINISTRATION among those mapped.
Grid position at a glance
- Serving utilities
- AVISTA CORP, BIG BEND ELECTRIC COOP, INC, BONNEVILLE POWER ADMINISTRATION, CLEARWATER POWER COMPANY, COLUMBIA RURAL ELEC ASSN, INC, INLAND POWER & LIGHT COMPANY
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 30
- Industrial retail rate
- 6.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 1.3 to 8.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 359 lb CO2/MWh
- Water withdrawals
- 11 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 29,218 employed in construction within ~120 km (13 of 14 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Whitman
What follows is a screening-grade read of Whitman, Washington, built only from named public datasets. Grid access in Whitman extends to 500 kV, a high-voltage line class. The mapped layer packs 30 substations into Whitman, a dense spread of options.
Because Whitman, Washington sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Whitman, the rate shown is the state industrial average of 6.9 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Whitman that report an industrial rate span 5 of 6 serving utilities: 1.3 to 8.0¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Whitman, Washington carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Whitman, Washington has no EIA-860M generation on file, which reads as zero rather than as a gap. Whitman sits under a balancing authority that eGRID puts at 358.777 lb CO2 per MWh.
Whitman withdrew 11.4 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 29,218 people are employed in construction within a 120 km commute of Whitman (BLS QCEW), which frames staffing distance rather than free labour.
For Whitman, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Whitman, Washington describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Whitman, Washington, a specific address needs its own interconnection study, which this page does not attempt. The figures for Whitman, Washington refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.