Power by county

Lewis, WV: data center power outlook

Lewis, West Virginia is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Lewis carries 2 mapped substations within its boundary, and the highest reachable grid access is 138 kV. Service in Lewis spans 2 utilities, with HARRISON RURAL ELEC ASSN, INC, MONONGAHELA POWER CO among those mapped.

Grid position at a glance

Serving utilities
HARRISON RURAL ELEC ASSN, INC, MONONGAHELA POWER CO
ISO / market
PJM (PJM Interconnection)
Highest grid access
138 kV
Substations in county
2
Industrial retail rate
8.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 2 serving utilities: 7.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
1.7 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
22,333 employed in construction within ~120 km (35 of 38 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Lewis

What follows is a screening-grade read of Lewis, West Virginia, built only from named public datasets. At 138 kV, Lewis sits in the transmission class that a large load would look to. Lewis, West Virginia carries a thin 2-substation footprint in the mapped layer, concentrating where a connection could land.

Interconnection over Lewis runs through the PJM market (PJM Interconnection) and its rules. For Lewis, the rate shown is the state industrial average of 8.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Lewis that report an industrial rate span 1 of 2 serving utilities: 7.7¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Lewis, West Virginia in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Lewis, West Virginia in EIA-860M as planned or under construction, which counts as a measured zero. Lewis sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Lewis withdrew 1.74 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 22,333 people are employed in construction within a 120 km commute of Lewis (BLS QCEW), which frames staffing distance rather than free labour.

For Lewis, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Lewis, West Virginia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Lewis, West Virginia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Lewis, West Virginia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources