Winnebago, WI: data center power outlook
The grid around Winnebago, Wisconsin is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Winnebago the mapped layer shows 23 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Winnebago is split among 5 utilities, among them CITY OF MENASHA - (WI), WISCONSIN ELECTRIC POWER CO, WISCONSIN POWER & LIGHT CO.
Grid position at a glance
- Serving utilities
- CITY OF MENASHA - (WI), WISCONSIN ELECTRIC POWER CO, WISCONSIN POWER & LIGHT CO, WISCONSIN PUBLIC SERVICE CORP, WPPI ENERGY
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 23
- Industrial retail rate
- 8.9¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 7.0 to 9.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 350 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 31 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 69,326 employed in construction within ~120 km (23 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Winnebago
The sections below set out what public data shows about siting a large electrical load in Winnebago, Wisconsin. At 345 kV, Winnebago carries high-voltage transmission at its strongest mapped point. Winnebago contains 23 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Winnebago clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Winnebago carries the state industrial average retail rate of 8.9 cents per kWh from EIA-861, applied statewide. For Winnebago, the per-utility spread is 4 of 5 serving utilities: 7.0 to 9.3¢/kWh, which qualifies but never replaces the state average.
Winnebago carries 3 projects in the interconnection queue, totalling 350 MW of requested capacity. For Winnebago, Wisconsin, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Winnebago shows 981.982 lb CO2 per MWh.
For Winnebago, the USGS 2015 compilation records 30.53 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Winnebago sits within commuting range of roughly 69,326 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Winnebago here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Winnebago, Wisconsin settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Winnebago, Wisconsin requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Winnebago, Wisconsin are logged directly below, so each figure on this page can be traced back to its public dataset.