Power by county

Natrona, WY: data center power outlook

Natrona, Wyoming is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Natrona carries 46 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Natrona spans 3 utilities, with HIGH PLAINS POWER INC, PACIFICORP, WAPA-- WESTERN AREA POWER ADMINISTRATION among those mapped.

Grid position at a glance

Serving utilities
HIGH PLAINS POWER INC, PACIFICORP, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
46
Industrial retail rate
8.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 3 serving utilities: 7.7 to 8.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,870 lb CO2/MWh
Water withdrawals
154 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
4,516 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Natrona

What follows is a screening-grade read of Natrona, Wyoming, built only from named public datasets. At 230 kV, Natrona sits in the transmission class that a large load would look to. The mapped layer packs 46 substations into Natrona, a dense spread of options.

Because Natrona, Wyoming sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Natrona, the rate shown is the state industrial average of 8.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Natrona that report an industrial rate span 2 of 3 serving utilities: 7.7 to 8.2¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Natrona, Wyoming in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Natrona, Wyoming has no EIA-860M generation on file, which reads as zero rather than as a gap. Natrona sits under a balancing authority that eGRID puts at 1,869.537 lb CO2 per MWh.

Natrona withdrew 153.92 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 4,516 people are employed in construction within a 120 km commute of Natrona (BLS QCEW), which frames staffing distance rather than free labour.

For Natrona, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Natrona, Wyoming describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Natrona, Wyoming, a specific address needs its own interconnection study, which this page does not attempt. The figures for Natrona, Wyoming refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources